Part Location Diagram of 1652217SM Murray PLUG-HEX HD (3100055)
See part M-41 in the diagram

PLUG-HEX HD (3100055) 1652217SM

Manufactured by:
Murray
ERP Number:
ERP18586663
Part Number:
1652217SM
Original Equipment Manufacturer ?
$30.40
Special Order

A Bit Difficult 

More than 2 hours 

(1 rated repair) ?

Does this part fit my model?

Need help finding your model number?

Troubleshooting

This part works with the following brands:
  • Simplicity
This part works with the following products:
  • Lawn Tractor
  • Lawn Mower
Part# 1652217SM replaces these:
1652217SM,

Questions & Answers

?

Our customer Service team is at the ready daily to answer your part and product questions.

We're sorry, but our Q&A experts are temporarily unavailable.
Please check back later if you still haven't found the answer you need.

Ask our Team

We have a dedicated staff with decades of collective experience in helping customers just like you purchase parts to repair their products.

Does this fit my product?

Customer Repair Instructions

All our customer repair instructions are solicited directly from other customers just like you who have purchased and replaced this exact part.

A Bit Difficult 

More than 2 hours 

(1 rated repair) ?
  • 1
Sort by:  
Sorry, we couldn't find any existing installation instruction that matched.

Hydrostatic transmission was not repaired correctly by machine shop

Ralph from Gladwin, Michigan

1 person found this instruction helpful.
Difficulty Level:
A Bit Difficult
Total Repair Time:
More than 2 hours
Tools:
Nutdriver, Screw drivers, Socket set, Wrench set
1. Tested charge pressure (30 PSI - should be 70-150 PSI) & Implement Circuit (40 PSI vs 700 to 800 psi) 1-1/2 hour setup and test
2. Removed hydro static transmission from tractor (5 hours including major disassembly of tractor)
3. Removed and checked forward and reverse acceleration valves ( 1 was installed backwards)
4. Removed and checked charge pressure and implement pressure valves ( charge valve components were totally missing) Went on line searched for and ordered charge valve components ( 3 hours)
5. Installed minimum shim in new charge valve - reinstalled transmission in tractor (4 hours)
6. Tested charge pressure - re-shim - retest 5x - got pressure to 95 PSI (2 hours )
7. Tested Implement pressure - (175 PSI) installed balance of shim kit on implement valve ( 180 PSI) (2 hours)
8. Finished putting tractor back together (4 hour ) Total time about 24 hours!
Did you find this story helpful?
Thank you for voting!
  • 1