Part Location Diagram of WG02F05807 GE TERM BLOCK LONG LEADS - WB2M2261
See part 3B in the diagram

TERM BLOCK LONG LEADS - WB2M2261 WG02F05807

Manufactured by:
GE
ERP Number:
ERP9862231
Part Number:
WG02F05807
Original Equipment Manufacturer ?
No Longer Available
No Longer Available

Unfortunately, this part isn't available any more at eReplacementParts. This could be because:

  • The manufacturer doesn't make this part any more
  • There are no substitute parts made by the manufacturer to replace this part
  • There is no longer any way for us to find this part and stock it in our warehouse

We would love to help you find the part you need, but our call center agents will, regrettably, be unable to assist you with tracking it down. However, you may still be able to locate the part you need by trying the following:

  • Using a search engine to type your part number and see if other retailers still have this part in stock
  • Visiting online stores such as eBay and finding sellers that have this part
  • Trying retailers and repair stores in your local area to see if they have the part in their inventory
  • Talking to a local repair technician, who may have the part you need, or may be able to repair your existing part
  • Reaching out to the manufacturer of your product to see what their recommendations are for replacing this part