KitchenAid Parts

KitchenAid Microwave Oven Combo Replacement Parts For Model YKEMC308KM01

We Sell Only Genuine KitchenAid Parts

Find KitchenAid YKEMC308KM01 Parts By Symptom

Little to no heat when baking

19%

Oven is too hot

14%

Element will not heat

14%

Door not closing properly

12%

Will Not Start

11%

Oven not heating evenly

8%

Tray won’t turn

7%

Door won’t close

5%

Won’t turn on

5%

Door won’t open after self cleaning cycle

3%

No heat

2%

Will not program

1%

Little to no heat when broiling

1%

Popular Parts for KitchenAid YKEMC308KM01

Search Within Model

Browse all Parts Search by Area
CABINET AND STIRRER PARTS Diagram and Parts List for YKEMC308KM01  KitchenAid Microwave Oven Combo
CABINET AND STIRRER PARTS
CONTROL PANEL PARTS Diagram and Parts List for YKEMC308KM01  KitchenAid Microwave Oven Combo
CONTROL PANEL PARTS
INTERNAL OVEN PARTS Diagram and Parts List for YKEMC308KM01  KitchenAid Microwave Oven Combo
INTERNAL OVEN PARTS
LATCH PARTS Diagram and Parts List for YKEMC308KM01  KitchenAid Microwave Oven Combo
LATCH PARTS
MICROWAVE COMPARTMENT PARTS Diagram and Parts List for YKEMC308KM01  KitchenAid Microwave Oven Combo
MICROWAVE COMPARTMENT PARTS
MICROWAVE DOOR PARTS, OPTIONAL PARTS Diagram and Parts List for YKEMC308KM01  KitchenAid Microwave Oven Combo
MICROWAVE DOOR PARTS, OPTIONAL PARTS
OVEN DOOR PARTS Diagram and Parts List for YKEMC308KM01  KitchenAid Microwave Oven Combo
OVEN DOOR PARTS
OVEN PARTS Diagram and Parts List for YKEMC308KM01  KitchenAid Microwave Oven Combo
OVEN PARTS
TOP VENTING PARTS Diagram and Parts List for YKEMC308KM01  KitchenAid Microwave Oven Combo
TOP VENTING PARTS
Previous Showing All Parts Next
CABINET AND STIRRER PARTS
CABINET AND STIRRER PARTS Diagram and Parts List for YKEMC308KM01  KitchenAid Microwave Oven Combo
  • 1
    BRKT-CPCTR – Part Number: 4375299
    BRKT-CPCTR
    Part Number: 4375299
      No Longer Available
  • 3
    GASKT-SHFT – Part Number: 4375252
    GASKT-SHFT
    Part Number: 4375252
      No Longer Available
  • 4
    SCREW – Part Number: 4340001
    SCREW
    Part Number: 4340001
      No Longer Available
  • 5
    DUCT-MAG – Part Number: 4375314
    DUCT-MAG
    Part Number: 4375314
      No Longer Available
  • 6
    SUPPORT – Part Number: 4375253
    SUPPORT
    Part Number: 4375253
      In Stock
    $24.96
  • 7
    GASKET-ELM – Part Number: 4375254
    GASKET-ELM
    Part Number: 4375254
      No Longer Available
  • 8
    GASKET-ELM – Part Number: 4375255
    GASKET-ELM
    Part Number: 4375255
      No Longer Available
  • 9
    REFLECTOR – Part Number: 4375256
    REFLECTOR
    Part Number: 4375256
      No Longer Available
  • 10
    REFLECTOR – Part Number: 4375257
    REFLECTOR
    Part Number: 4375257
      No Longer Available
  • 12
    DUCT-MAG – Part Number: 4375260
    DUCT-MAG
    Part Number: 4375260
      No Longer Available
  • 13
    INSULATOR – Part Number: 4375316
    INSULATOR
    Part Number: 4375316
      No Longer Available
  • 14
    Fan – Part Number: WP4375322
    Fan
    Part Number: WP4375322
      No Longer Available
  • 15
    DUCT-CAVTY – Part Number: 4375317
    DUCT-CAVTY
    Part Number: 4375317
      No Longer Available
  • 16
    BLOCK-SLID – Part Number: WP8184080
    BLOCK-SLID
    Part Number: WP8184080
      No Longer Available
  • 17
    Wave Guide Cover – Part Number: WP4375338
    Wave Guide Cover
    Part Number: WP4375338
      No Longer Available
  • 18
    Screw – Part Number: 8206180
    Screw
    Part Number: 8206180
      In Stock
    $21.95
  • 19
    Lamp Lens – Part Number: W11193483
    Lamp Lens
    Part Number: W11193483
      Special Order
    $51.29
  • 20
    SPRING – Part Number: W10465869
    SPRING
    Part Number: W10465869
      In Stock
    $54.90
  • 21
    Reflector – Part Number: 423107022541
    Reflector
    Part Number: 423107022541
      Special Order
    $58.07
  • 22
    USE WPL W10106520A – Part Number: 4393900
    USE WPL W10106520A
    Part Number: 4393900
      Special Order
    $11.91
  • 23
    Convection Rack - Short – Part Number: 4452220
    Convection Rack - Short
    Part Number: 4452220
      Special Order
    $83.23
  • 24
    COOKWARE – Part Number: W11512490
    COOKWARE
    Part Number: W11512490
      Special Order
    $62.65
  • 25
    High Voltage Capacitor – Part Number: WP4375020
    High Voltage Capacitor
    Part Number: WP4375020
      In Stock
    $122.89
  • 26
    Magnetron – Part Number: WP4375424
    Magnetron
    Part Number: WP4375424
      In Stock
    $340.43
  • 27
    Line Fuse – Part Number: WP4375321
    Line Fuse
    Part Number: WP4375321
      In Stock
    $22.79
  • 28
    Fuse Block – Part Number: W10245194
    Fuse Block
    Part Number: W10245194
      On Order
    $51.65
  • 29
    Fan Motor – Part Number: 4375278
    Fan Motor
    Part Number: 4375278
      Special Order
    $177.73
  • 30
    Thermostat – Part Number: 4375279
    Thermostat
    Part Number: 4375279
      No Longer Available
  • 31
    Magnetron Thermostat – Part Number: WP4375079
    Magnetron Thermostat
    Part Number: WP4375079
      In Stock
    $51.65
  • 32
    THRMST-FIX – Part Number: 4375281
    THRMST-FIX
    Part Number: 4375281
      No Longer Available
  • 33
    Heating Element – Part Number: WP8186528
    Heating Element
    Part Number: WP8186528
      No Longer Available
  • 34
    Transformer – Part Number: WP4375286
    Transformer
    Part Number: WP4375286
      In Stock
    $252.05
  • 35
    Turntable Support – Part Number: WP4375442
    Turntable Support
    Part Number: WP4375442
      No Longer Available
  • 36
    SHAFT-TURN – Part Number: W11512454
    SHAFT-TURN
    Part Number: W11512454
      Special Order
    $26.05
  • 39
    Switch Kit – Part Number: W10727408
    Switch Kit
    Part Number: W10727408
      In Stock
    $111.01
  • 39
    Switch Kit – Part Number: W10727408
    Switch Kit
    Part Number: W10727408
      In Stock
    $111.01
  • 42
    BRKT-MOUNT – Part Number: 4375331
    BRKT-MOUNT
    Part Number: 4375331
      No Longer Available
  • 43
    BRKT-THERM – Part Number: 4375332
    BRKT-THERM
    Part Number: 4375332
      No Longer Available
  • 44
    CAP-FAN – Part Number: 4375441
    CAP-FAN
    Part Number: 4375441
      No Longer Available
  • 46
    Switch Kit – Part Number: W10727408
    Switch Kit
    Part Number: W10727408
      In Stock
    $111.01
  • 46
    Switch Kit – Part Number: W10727408
    Switch Kit
    Part Number: W10727408
      In Stock
    $111.01
  • 47
    NUT – Part Number: 4375258
    NUT
    Part Number: 4375258
      No Longer Available
  • 48
    INSULATION – Part Number: 4375409
    INSULATION
    Part Number: 4375409
      No Longer Available
  • 48
    INSULATION – Part Number: 4375410
    INSULATION
    Part Number: 4375410
      No Longer Available
  • 49
    BASE – Part Number: 4375411
    BASE
    Part Number: 4375411
      No Longer Available
  • 50
    BAFFLE-AIR – Part Number: 4375425
    BAFFLE-AIR
    Part Number: 4375425
      No Longer Available
  • 51
    SHIELD – Part Number: 4375428
    SHIELD
    Part Number: 4375428
      No Longer Available
  • 52
    Vent Damper Actuator – Part Number: 461967842541
    Vent Damper Actuator
    Part Number: 461967842541
      On Order
    $50.10
  • 53
    BLEED-AIR – Part Number: 4375426
    BLEED-AIR
    Part Number: 4375426
      No Longer Available
  • 54
    SHIELD-INS – Part Number: 4375439
    SHIELD-INS
    Part Number: 4375439
      No Longer Available
  • 55
    THERMISTOR – Part Number: 4375422
    THERMISTOR
    Part Number: 4375422
      No Longer Available
  • 56
    INSULATION – Part Number: 4375420
    INSULATION
    Part Number: 4375420
      No Longer Available
  • 57
    DUCT-AIR – Part Number: 4375419
    DUCT-AIR
    Part Number: 4375419
      No Longer Available
  • 58
    WASHER – Part Number: 4375416
    WASHER
    Part Number: 4375416
      No Longer Available
  • 59
    HEATER – Part Number: 4375417
    HEATER
    Part Number: 4375417
      No Longer Available
  • 60
    FAN – Part Number: W11512064
    FAN
    Part Number: W11512064
      Special Order
    $83.54
  • 61
    MOTOR-FAN – Part Number: 4375429
    MOTOR-FAN
    Part Number: 4375429
      No Longer Available
  • 62
    No Longer Available – Part Number:
    No Longer Available
    Part Number:
      No Longer Available
  • 63
    Thermostat – Part Number: W11607085
    Thermostat
    Part Number: W11607085
      In Stock
    $36.53
  • 64
    SHIELD-INS – Part Number: 4375431
    SHIELD-INS
    Part Number: 4375431
      No Longer Available
  • 65
    INSULATION – Part Number: 4375432
    INSULATION
    Part Number: 4375432
      No Longer Available
  • 66
    DUCT-MAG – Part Number: 4375433
    DUCT-MAG
    Part Number: 4375433
      No Longer Available
  • 66
    No Longer Available – Part Number:
    No Longer Available
    Part Number:
      No Longer Available
  • 67
    BRKT-CPCTR – Part Number: 4375299
    BRKT-CPCTR
    Part Number: 4375299
      No Longer Available
  • 68
    Wave Guide Cover – Part Number: 4375338
    Wave Guide Cover
    Part Number: 4375338
      No Longer Available
  • 71
    COVER-SIDE – Part Number: 4375341
    COVER-SIDE
    Part Number: 4375341
      No Longer Available
  • 71
    COVER-SIDE – Part Number: 4375342
    COVER-SIDE
    Part Number: 4375342
      No Longer Available
  • 72
    Microwave Turntable Tray – Part Number: W11373838
    $74.17
  • 73
    Door Switch - 250V – Part Number: W10211972
    Door Switch - 250V
    Part Number: W10211972
      In Stock
    $49.45
  • 74
    MOTOR-TURN – Part Number: W10642989
    MOTOR-TURN
    Part Number: W10642989
      In Stock
    $92.32
  • 75
    Microwave Halogen Bulb – Part Number: WPW10440740
    Microwave Halogen Bulb
    Part Number: WPW10440740
      In Stock
    $28.55
  • 76
    Diode – Part Number: WPW10687786
    Diode
    Part Number: WPW10687786
      In Stock
    $26.08
  • 77
    WIRE-VLTGE – Part Number: 4375435
    WIRE-VLTGE
    Part Number: 4375435
      No Longer Available
CONTROL PANEL PARTS
CONTROL PANEL PARTS Diagram and Parts List for YKEMC308KM01  KitchenAid Microwave Oven Combo
INTERNAL OVEN PARTS
INTERNAL OVEN PARTS Diagram and Parts List for YKEMC308KM01  KitchenAid Microwave Oven Combo
  • 2
    Screw – Part Number: WP4449154
    Screw
    Part Number: WP4449154
      In Stock
    $7.56
  • 2
    Range Broil Element – Part Number: WPW10207400
    Range Broil Element
    Part Number: WPW10207400
      In Stock
    $204.57
  • 3
    2 Piece Broiler Pan – Part Number: 4396923
    2 Piece Broiler Pan
    Part Number: 4396923
      In Stock
    $47.08
  • 4
    2 Piece Broiler Pan – Part Number: 4396923
    2 Piece Broiler Pan
    Part Number: 4396923
      In Stock
    $47.08
  • 5
    Broiler Pan with Roasting Rack – Part Number: W10123240
    Broiler Pan with Roasting Rack
    Part Number: W10123240
      In Stock
    $86.21
  • 6
    Range Rack – Part Number: WPW10179152
    Range Rack
    Part Number: WPW10179152
      In Stock
    $78.73
  • 7
    Bake Element – Part Number: 4451175
    Bake Element
    Part Number: 4451175
      In Stock
    $120.36
  • 8
    Nut, Hidden – Part Number: WP9755546
    Nut, Hidden
    Part Number: WP9755546
      Special Order
    $7.56
  • 9
    Convection Fan Motor Assembly – Part Number: 4451583
    Convection Fan Motor Assembly
    Part Number: 4451583
      No Longer Available
  • 9
    Screw – Part Number: WP4449154
    Screw
    Part Number: WP4449154
      In Stock
    $7.56
  • 10
    FAN-CONVCT – Part Number: WP4452226
    FAN-CONVCT
    Part Number: WP4452226
      Special Order
    $47.97
  • 11
    Lockwasher – Part Number: WP9755547
    Lockwasher
    Part Number: WP9755547
      Special Order
    $9.74
  • 12
    Nut – Part Number: WP4452227
    Nut
    Part Number: WP4452227
      Special Order
    $21.64
  • 13
    Meat Probe Receptacle – Part Number: 8186589
    Meat Probe Receptacle
    Part Number: 8186589
      In Stock
    $82.93
  • 14
    Range Temperature Probe – Part Number: WP9755542
    Range Temperature Probe
    Part Number: WP9755542
      In Stock
    $78.87
  • 15
    Hidden Bake Tray – Part Number: WP4455037
    Hidden Bake Tray
    Part Number: WP4455037
      No Longer Available
  • 17
    COVR-ACESS – Part Number: 4450039
    COVR-ACESS
    Part Number: 4450039
      Special Order
    $51.17
  • 17
    Range Screw – Part Number: WP4449809
    Range Screw
    Part Number: WP4449809
      In Stock
    $7.64
  • 20
    Screw – Part Number: WP4449154
    Screw
    Part Number: WP4449154
      In Stock
    $7.56
  • 20
    Element – Part Number: WP9760769
    Element
    Part Number: WP9760769
      In Stock
    $165.35
  • 21
    Screw – Part Number: WP4449154
    Screw
    Part Number: WP4449154
      In Stock
    $7.56
  • 21
    COVER-FAN – Part Number: WPW10160821
    COVER-FAN
    Part Number: WPW10160821
      Special Order
    $134.91
LATCH PARTS
LATCH PARTS Diagram and Parts List for YKEMC308KM01  KitchenAid Microwave Oven Combo
  • 1
    VENT-EXHST – Part Number: 4451759
    VENT-EXHST
    Part Number: 4451759
      Special Order
    $58.07
  • 2
    ELBOW-TOP – Part Number: 4455178
    ELBOW-TOP
    Part Number: 4455178
      Special Order
    $21.70
  • 3
    PLATE-MTG – Part Number: 4455191
    PLATE-MTG
    Part Number: 4455191
      Special Order
    $20.62
  • 4
    BRKT-MNTG – Part Number: 8300791
    BRKT-MNTG
    Part Number: 8300791
      No Longer Available
  • 5
    ELBOW-BTM – Part Number: 4455177
    ELBOW-BTM
    Part Number: 4455177
      Special Order
    $17.35
  • 6
    Foam Seal – Part Number: W10491987
    Foam Seal
    Part Number: W10491987
      In Stock
    $9.75
  • 9
    Screw – Part Number: WP4449154
    Screw
    Part Number: WP4449154
      In Stock
    $7.56
  • 9
    BAFFLE – Part Number: 4450408
    BAFFLE
    Part Number: 4450408
      No Longer Available
  • 10
    Range Motorized Door Lock Latch – Part Number: WPW10195934
    Range Motorized Door Lock Latch
    Part Number: WPW10195934
      In Stock
    $175.75
  • 16
    Range Blower Motor Assembly – Part Number: WPW10016550
    Range Blower Motor Assembly
    Part Number: WPW10016550
      In Stock
    $194.13
  • 16
    Range Screw – Part Number: WP4449809
    Range Screw
    Part Number: WP4449809
      In Stock
    $7.64
  • 19
    EXTENSION – Part Number: 4449906
    EXTENSION
    Part Number: 4449906
      No Longer Available
MICROWAVE COMPARTMENT PARTS
MICROWAVE COMPARTMENT PARTS Diagram and Parts List for YKEMC308KM01  KitchenAid Microwave Oven Combo
  • 5
    SUPPORT – Part Number: 4450404
    SUPPORT
    Part Number: 4450404
      No Longer Available
  • 5
    SUPPORT – Part Number: 4450405
    SUPPORT
    Part Number: 4450405
      No Longer Available
  • 5
    Range Screw – Part Number: WP4449809
    Range Screw
    Part Number: WP4449809
      In Stock
    $7.64
  • 11
    CHANNEL – Part Number: 4452548
    CHANNEL
    Part Number: 4452548
      No Longer Available
  • 11
    Screw – Part Number: WP4449154
    Screw
    Part Number: WP4449154
      In Stock
    $7.56
  • 11
    Range Screw – Part Number: WP4449809
    Range Screw
    Part Number: WP4449809
      In Stock
    $7.64
MICROWAVE DOOR PARTS, OPTIONAL PARTS
MICROWAVE DOOR PARTS, OPTIONAL PARTS Diagram and Parts List for YKEMC308KM01  KitchenAid Microwave Oven Combo
OVEN DOOR PARTS
OVEN DOOR PARTS Diagram and Parts List for YKEMC308KM01  KitchenAid Microwave Oven Combo
OVEN PARTS
OVEN PARTS Diagram and Parts List for YKEMC308KM01  KitchenAid Microwave Oven Combo
TOP VENTING PARTS
TOP VENTING PARTS Diagram and Parts List for YKEMC308KM01  KitchenAid Microwave Oven Combo
  • 1
    TOP-CABNT – Part Number: 4450378
    TOP-CABNT
    Part Number: 4450378
      No Longer Available
  • 1
    Range Screw – Part Number: WP4449809
    Range Screw
    Part Number: WP4449809
      In Stock
    $7.64
  • 2
    BAFFLE-AIR – Part Number: 4448935
    BAFFLE-AIR
    Part Number: 4448935
      No Longer Available
  • 2
    Screw – Part Number: 489392
    Screw
    Part Number: 489392
      Special Order
    $21.70
  • 3
    BLOWER – Part Number: W11361286
    BLOWER
    Part Number: W11361286
      No Longer Available
  • 3
    Range Screw – Part Number: WP4449809
    Range Screw
    Part Number: WP4449809
      In Stock
    $7.64
  • 4
    PLATE-MTG – Part Number: 4451789
    PLATE-MTG
    Part Number: 4451789
      No Longer Available
  • 5
    Range Lights Transformer 60hz – Part Number: WP9760588
    Range Lights Transformer 60hz
    Part Number: WP9760588
      In Stock
    $152.22
  • 5
    Range Screw – Part Number: WP4449809
    Range Screw
    Part Number: WP4449809
      In Stock
    $7.64
  • 6
    DUCT-AIR – Part Number: 4451634
    DUCT-AIR
    Part Number: 4451634
      No Longer Available
  • 7
    BRKT-MNTG – Part Number: 4450027
    BRKT-MNTG
    Part Number: 4450027
      No Longer Available
  • 8
    GROMMET – Part Number: 4449964
    GROMMET
    Part Number: 4449964
      No Longer Available
  • 8
    Range Hex Nut – Part Number: WP112432
    Range Hex Nut
    Part Number: WP112432
      On Order
    $7.56
  • 8
    Range Screw – Part Number: WP4449809
    Range Screw
    Part Number: WP4449809
      In Stock
    $7.64
  • 9
    BLOCK-FUSE – Part Number: 4454949
    BLOCK-FUSE
    Part Number: 4454949
      Special Order
    $51.17
  • 9
    Screw – Part Number: WP4449154
    Screw
    Part Number: WP4449154
      In Stock
    $7.56
  • 10
    Fuse – Part Number: WPW10017410
    Fuse
    Part Number: WPW10017410
      In Stock
    $17.40
  • 11
    SCREW – Part Number: W11684512
    SCREW
    Part Number: W11684512
      Special Order
    $18.44
  • 11
    Range Main Power Terminal Block – Part Number: WP8203546
    Range Main Power Terminal Block
    Part Number: WP8203546
      In Stock
    $25.25
  • 12
    SIDE-COMPT – Part Number: 4452559
    SIDE-COMPT
    Part Number: 4452559
      No Longer Available
  • 12
    Range Screw – Part Number: WP4449809
    Range Screw
    Part Number: WP4449809
      In Stock
    $7.64
  • 13
    Range Control Panel Vent Screw – Part Number: WP4450038
    Range Control Panel Vent Screw
    Part Number: WP4450038
      In Stock
    $7.65
  • 13
    VENT-CNTRL – Part Number: 4456145
    VENT-CNTRL
    Part Number: 4456145
      No Longer Available
  • 14
    SIDE-COMPT – Part Number: W10790240
    SIDE-COMPT
    Part Number: W10790240
      Special Order
    $51.17
  • 14
    SIDE-COMPT – Part Number: W10755214
    SIDE-COMPT
    Part Number: W10755214
      Special Order
    $51.17
  • 14
    Range Screw – Part Number: WP4449809
    Range Screw
    Part Number: WP4449809
      In Stock
    $7.64
  • 15
    COVER-REAR – Part Number: 4450658
    COVER-REAR
    Part Number: 4450658
      No Longer Available
  • 15
    Range Screw – Part Number: WP4449809
    Range Screw
    Part Number: WP4449809
      In Stock
    $7.64
  • 16
    TOP-CABNT – Part Number: WP4450551
    TOP-CABNT
    Part Number: WP4450551
      No Longer Available
  • 16
    Range Screw – Part Number: WP4449809
    Range Screw
    Part Number: WP4449809
      In Stock
    $7.64
  • 17
    BRKT-MNTG – Part Number: 4448664
    BRKT-MNTG
    Part Number: 4448664
      Special Order
    $22.79
  • 17
    Range Screw – Part Number: WP4449809
    Range Screw
    Part Number: WP4449809
      In Stock
    $7.64
  • 18
    COVER-TOP – Part Number: WP4452367
    COVER-TOP
    Part Number: WP4452367
      Special Order
    $67.58
  • 18
    Range Screw – Part Number: WP4449809
    Range Screw
    Part Number: WP4449809
      In Stock
    $7.64
  • 19
    Transformer – Part Number: WP9760589
    Transformer
    Part Number: WP9760589
      No Longer Available
  • 21
    Relay – Part Number: WP9752759
    Relay
    Part Number: WP9752759
      In Stock
    $103.53
  • 22
    Wall Oven Noise Filter Board – Part Number: WP4451934
    Wall Oven Noise Filter Board
    Part Number: WP4451934
      No Longer Available